Depot charging and peak shaving for transport & logistics
Battery storage on existing grid connections, so that hauliers, distribution centres and cold stores can electrify without waiting for a grid upgrade.
In the Netherlands, over 14,000 companies are waiting for grid capacity; large consumers in congested areas wait 1 to 5 years. Enerx designs battery storage that buffers the available capacity and delivers peak power to e-truck chargers and refrigeration compressors. Publicly documented projects (Hattemerbroek, Apeldoorn, Haps) show that this works: 20 e-trucks on 64 kW, 720 kW of truck charging on a connection that cannot be upgraded.
Key facts
| Target group | Hauliers, DCs, cold and frozen storage |
| System | AlphaESS STORION H30/H50 – Aster TB500 |
| Schemes | EIA 40%, Flex-e up to € 300,000 |
| Status | Quick scans and initial business cases |