AlphaESS home and commercial batteries · Delivered throughout the Netherlands Reply within 1 working day · info@enerx.nl
Transport & logistics

Electrify your fleet without waiting for the grid.

A single e-truck requires 50 to 150 kW of charging power. Charging five trucks at once exceeds most commercial connections, and a heavier connection takes 1 to 5 years in congested areas. Battery storage from Enerx charges during the day or at night and delivers the power when your trucks need it.

  • 30 kW – 500 kW per system, scalable to 2.4 MWh
  • EIA: 40% of the investment deductible
  • Flex-e grant of up to € 300,000 in congested areas
  • Design, engineering, installation and EMS

What battery storage does for a logistics company

Depot charging on your current connection

The battery buffers energy and delivers peak power to your chargers. You charge more vehicles on the same connection, without an upgrade.

Peak shaving for cold stores

Compressor peaks are absorbed by the battery. You lower your contracted capacity and avoid penalties for exceeding it.

Make use of solar power from your own roof

A large roof generates more than you use during the day, and feeding in is often not permitted. The battery keeps that power for your chargers and your night shift.

Backup power for critical processes

Refrigeration, IT and access systems keep running during an outage. Switchover within 20 milliseconds.

Proven in practice

This is already happening in the Netherlands

These examples are publicly documented third-party projects. They show what battery storage means for transport and logistics.

20 e-trucks on a 64 kW connection

A haulier in Hattemerbroek charges 20 electric trucks with a 6 MWh battery and 1.8 MWp of solar panels: 95% of the charging power comes from its own roof, with no grid upgrade.

Source: Maxem, Jan Bakker case study

Distribution centre keeps electrifying despite grid congestion

A DC in Apeldoorn combines 2,274 MWh of solar power a year with a 699 kWh / 300 kW battery and 12 charging points.

Source: Solar Magazine, July 2026

720 kW of truck charging on a connection that cannot be upgraded

A logistics site in Haps combines 2.2 MWp of solar, over 1,000 kWh of storage and four truck chargers totalling 720 kW.

Source: Vastgoedmarkt, September 2026

Schemes for commercial battery storage in 2026

EIA – Energy Investment Allowance

40% of the investment additionally deductible from taxable profit (code 251118, battery for storing renewably generated electricity). 2026 budget: € 460 million.

Flex-e

Grant for flexible electricity use in congested areas: 40% of costs up to € 300,000 for flexibility measures such as batteries. 2026 round open until 15 October.

KIA – Small-Scale Investment Allowance

Up to 28% allowance for investments between € 2,901 and € 398,236, can be combined with the EIA.

Conditions change regularly. We assess which schemes apply to your project and handle the application on request.

Our approach for businesses

1

Quick scan

Analysis of your grid connection, consumption profile, charging requirements and roof. Initial sizing within two weeks.

2

Business case

Capacity, power, investment, subsidies and payback period, including scenarios for fleet growth.

3

Engineering & supply

AlphaESS STORION or Aster systems, including energy management (EMS) and integration with chargers and PV.

4

Installation & management

Installation by certified partners, commissioning, monitoring and maintenance.

Book a quick scan for your site

Send us your consumption data or your question. We respond within one working day.